2. Cabling
4821-A2-GN21-10 July 2004
2-7
Ground
Procedure
To connect the unit to a ground:
1. Crimp a ring terminal onto the stripped end of 14 AWG or heavier copper
ground wire.
2. Remove the screw marked by the ground symbol ( ) at the right side of the
front panel.
3. Fasten the ring terminal to the front panel using the same screw.
4. Attach the ground wire to an earth ground.
04-17532
To Earth Ground
POTS 1-24
DSL P
O
RTS 25-48